Mdot construction i 94

Mdot construction i 94 DEFAULT

I-94 Maple Grove to Clearwater

Traffic impacts

I-94 Maple Grove to Clearwater project location map

All traffic impacts are tentative and weather dependent. For real-time travel information in this project area or anywhere in Minnesota visit 511mn.org or dial 5-1-1. 

Current

Motorists are advised to follow posted speed limits; fines are up to $300 in work zones. Reduced speed limits are in effect through November.

Road closures

Maple Grove to Rogers
Tue, Aug. 31 through mid-October
Through November
  • The four-way intersection at Territorial Rd. and Fletcher Ln. is reduced to a three-way intersection with a temporary signal. Access to NB Fletcher Ln. from the intersection is closed.

Lane closures

Maple Grove to Rogers
Wed, Oct. 13 from 7 a.m. to 5 p.m.
  • Brockton Ln. is reduced to a single lane between Territorial Rd. and Rush Creek
Through October
  • Intermittent lane closures on I-94 in both directions between I-94/I-I694/I-494 and Hwy 101 during non-rush hour times
St. Michael to Albertville
Through Mon, Nov. 1
  • The left lane on the WB I-94 local access road is closed between the Wright Co. Rd. 37 entrance ramp and the Wright Co. Rd. 19 exit ramp
Mon, April 12 through November
  • Wright Co. Rd. 19 is reduced to a single lane in both directions between Wright Co. Rd. 37 and the I-94 bridge
Mon, March 29 through October
  • Hwy 241 is reduced to a single lane in both directions between I-94 and Oakwood Pkwy.
Monticello to Clearwater
Through Mon, Nov. 1
  • I-94 is reduced to a single lane in both directions between Wright Co. Rd. 8 and Hwy 24 nightly
    • Note: No closures occur on Saturdays

Ramp closures

Maple Grove to Rogers
10 p.m. Fri, Oct. 15 through 9 a.m. Sat, Oct. 16
  • The flyover ramp from WB I-94 to Hwy 101 is closed
    • Note: Access to Hwy 101 is maintained at the ramp intersection
Mon, Oct. 11 through Fri, Oct. 15; 10 p.m. to 6 a.m. nightly
  • The ramp from NB I-494 to WB I-94 is closed
    • Detour: EB I-694 to Hwy 169 to WB I-694 to WB I-94
    • Note: no nightly closures on Tuesday or Wednesday night
St. Michael to Albertville
Through late October
Mon, Aug. 30 through Mon, Nov. 1
Tue, Sept. 7 through early October

Lane alterations

Maple Grove to Rogers
Mon, May 3 through Mon, Oct. 18
  • WB I-94 lanes are separated between the I-94/494/694 interchange and Hwy 241
    • Note: Motorists will need to decide which lane to take before the I-94/494/694 interchange. The left lane will be a through lane with no on/off access to local roads until Hwy 241. The two right lanes will provide local access to exits at Weaver Lake Rd., Maple Grove Pkwy., Hwy 101 and Hwy 241.
      • Check out our dashcam video on how to navigate this lane configuration
St. Michael to Albertville
Thu, June 17 through October
  • EB I-94 lanes separated between Wright Co. Rd. 19 and Hwy 241
    • Note: Both the left and right lanes continue on eastbound I-94 past St. Michael. Only the right lane gives access to exits at Co. Rd. 19 and Co. Rd. 37 in Albertville.
Monticello to Clearwater
Tue, Oct. 12
  • WB I-94 lanes between Hwy 25 and Wright Co. Rd. 8 return to westbound side of the freeway
    • Note: Two lanes are available. This lane configuration is in place through the winter.
Fri, Oct. 15
  • EB I-94 lanes between Hwy 25 and Wright Co. Rd. 8 return to normal configuration
    • Note: Two lanes are available. This lane configuration is in place through the winter.

Upcoming

Information about upcoming traffic impacts will be posted as details become available.

About this project

I-94 between Maple Grove and Clearwater is undergoing three years of improvements and upgrades along a 39-mile stretch of road. We are adding travel lanes, rebuilding bridges, constructing access lanes, improving drainage, adding an interchange, and resurfacing deteriorating pavement. When complete, motorists will experience improved safety, a smoother road surface, better commercial access for freight and business, and less vehicle congestion.

Summary of work

Reconstruct roads

  • 9 miles between Maple Grove and Rogers (2020-2021)
  • 6 miles between St. Michael and Albertville (2019-2021)
  • 15 miles between Monticello and Clearwater (2019-2021)

Add lanes

  • Add a lane on I-94 in both directions between Hwy 610 in Maple Grove and Hwy 101 in Rogers (total of four each way)
  • Add a lane on WB I-94 between Hwy 241 in St. Michael and Wright Co. Rd. 37 in Albertville and add a lane on EB I-94 between Hwy 241 in St. Michael and Wright Co. Rd. 19 in Albertville (total of three each way)
  • Add a lane on I-94 in both directions between Hwy 25 in Monticello and Hwy 24 in Clearwater (total of three each way)

Build interchanges and construct bridges

  • Build a diverging diamond interchange, trails and sidewalks southeast of Brockton Ln. in Dayton
  • Replace Hwy 241 bridge over I-94 in St. Michael and improve access
    • Construct roundabout at Hwy 241 and O’Day Ave. in St. Michael
  • Replace I-94 bridges over Co. Rd. 19 in Albertville and improve access

Add freight improvements

  • Add 10 parking spaces in Elm Creek Rest Area
  • Install digital signage system with real-time availability of Elm Creek Rest Area spaces
  • Improve the parking lot and sidewalks at the Enfield Rest Area
  • Improve and increase lanes for smoother merging and exiting

Additional local improvements


Stay Safe MN

Road work continues to be a critical service. MnDOT is committed to protecting the health, safety and well-being of its employees, contractors and all Minnesotans. Crews continue to follow the guidance of state and federal health officials to help prevent the spread of COVID-19.

Schedule

Location

  • I-494 Maple Grove to Hwy 101 Rogers
  • Dayton Pkwy. interchange, south of Brockton Ln. near Dayton
  • Wright Co. Rd. 19 Albertville to Hwy 241 St. Michael
  • Hwy 25 Monticello to Hwy 24 Clearwater

Benefits

  • Reduce congestion
  • Improve safety
  • Provide a smoother ride
  • Extend life of highway
  • Improve freight access
  • Economic development
  • Address planned growth
  • Provide good distribution to other arterial routes

Cost

2021 Minnesota Department of Transportation
395 John Ireland Blvd, St. Paul, MN 55155-1800
651-296-3000 Toll-free 800-657-3774 Sours: https://www.dot.state.mn.us/i94-mg-clearwater/

MDOT Update: Ramp Closures On I-94, I-275 As Part Of Rebuilding I-275 Project

(CBS DETROIT) – The Michigan Department of Transportation is reminding Michiganders that there will be ramp closures on I-94 and I-275 through October as part of the Rebuilding I-275 project.

READ MORE: Michigan Reports 8,671 New COVID-19 Cases, 110 Deaths

COUNTIES:

Wayne

Monroe

COMMUNITIES:

Ash Township

Canton Township

Huron Township

Livonia

Plymouth

Romulus

Van Buren Township

ROADWAYS:

I-275

I-94

OVERALL PROJECT END DATE:

2024

READ MORE: New Partnership Between WCCCD, Detroit Police Department Offers New Career Opportunities For High Schoolers

TRAFFIC RESTRICTIONS AND UPDATES (also found at www.Revive275.org):

Wednesday, Sept. 15 – late October:

Wednesday, Sept. 15 – late September:

–  The southbound I-275 ramps to eastbound and westbound South Huron Road will be closed.

–  The eastbound South Huron Road ramp to southbound I-275 will be closed.

Through early October:

Mid-September – early October:

Now through late fall:

Mid-September – late fall:

6 Mile Road will be closed over I-275 for bridge improvements through late September with traffic detoured. 5 Mile Road will close over I-275 once 6 Mile Road has reopened.

I-275/6 Mile Road detours:

  • Northbound I-275 traffic heading for westbound 6 Mile Road will use northbound I-275 to westbound 7 Mile Road, then southbound I-275 to westbound 6 Mile Road.
  • Southbound I-275 traffic heading for eastbound 6 Mile Road will use southbound I-275 to eastbound Ann Arbor Road, then northbound I-275 to eastbound 6 Mile Road.
  • Eastbound 6 Mile Road will be detoured to northbound Haggerty Road, then eastbound 7 Mile Road to southbound Newburgh Road back to eastbound 6 Mile Road.
  • Westbound 6 Mile Road will be detoured to northbound Newburgh Road, then westbound 7 Mile Road to southbound Haggerty Road back to westbound 6 Mile Road.

During this major multi-year project, work will be occurring in multiple areas at different times. Go to www.Revive275.org for more project details and updates.

MORE NEWS: Large African Cat Escapes Owner, Prowls Royal Oak

© 2021 CBS Broadcasting Inc. All Rights Reserved. This material may not be published, broadcast, rewritten, or redistributed.

Related

Sours: https://detroit.cbslocal.com/2021/09/16/mdot-update-ramp-closures-on-i-94-i-275-as-part-of-rebuilding-i-275-project/
  1. Gatlinburg cabins sleeps 4
  2. Telenovela turca en español
  3. The home depot truck
  4. 420 shirt ideas

I-94 Road and Bridge Reconstruction, Jackson County

View Other Major Projects

Start: Summer 2018     End: Spring 2024
Investment: $350 million

 

Local, national and international trade traffic on I-94 in Jackson has increased substantially since the freeway opened to traffic in 1960. The current corridor is, in part, functionally obsolete and is scheduled to be upgraded to current design standards in the next seven to 10 years. This Michigan Department of Transportation (MDOT) multi-year project will update this corridor, with the goal to balance safety, mobility, lifecycle costs, aesthetics, and environmental sustainability. All this work includes improvements identified in the I-94 Jackson Freeway Modernization Project study, which included a Record of Decision in March 2007. 

 

What Is Being Done?

I-94 (Michigan Ave) logo

This project is broken down into three phases.

Phase 1 (2018 - 2020)

During this first phase, MDOT made the following improvements along I-94:

  • Rebuilt 1.4 miles of freeway between Lansing Avenue and Elm Road.
  • Resurfaced 3.5 miles between Lansing Avenue and M-60, and 4 miles between Elm Road and Sargent Road.
  • Rebuilt the I-94/Cooper Street interchange, built new roundabouts on each side of the new bridge, and rebuilt each of the ramps.
  • Replaced the I-94 bridge over the Grand River.

As part of this phase, I-94 was shifted approximately 60 feet south of its current location.

Phase 2 (Spring 2021 - Summer 2023)
- Public Meeting - February 24, 2021

In this phase, MDOT will rebuild portions of I-94 between the Airport Road interchange and the US-127 south interchange. Other improvements include:

  • Rebuilding the I-94/US-127/West Avenue interchange to be a diverging diamond interchange.
  • Rebuilding the Lansing Avenue bridge over I-94 to be higher and wider than the current bridge to accommodate the widening of I-94.
  • Rebuilding the I-94/Elm Avenue interchange to include roundabouts at the eastbound ramp terminal, the westbound ramp terminal, and the Rosehill Road/Elm Avenue/Seymour Road intersection. 
  • Installing freeway lighting on I-94 from the Airport Road interchange to east of the Elm Road interchange to improve safety for motorists and first responders. This will include lighting on most ramps within the project limits.

Phase 3 (2022 - 2024)

Work in this phase will include:

  • Rebuilding approximately 12.5 miles of freeway from the Jackson/Calhoun County line to M-60.
  • Reconfiguring the Michigan Avenue interchange with the addition of roundabouts.
  • Reconfiguring the Dearing Road interchange with the addition of roundabouts.
  • Preventive maintenance on 10 bridges along the I-94 corridor.

More information on this phase: I-94 Jackson Public Meeting Presentation PDF icon

How Traffic Will Be Affected:

 

  • During work, two lanes will be open in each direction most of the time on I-94, with short-term single-lane closures possible at off-peak times.
  • The Lansing Avenue bridge will be closed and detoured while it is being rebuilt.
  • More information on specific traffic impacts will be provided in spring 2021 through a public meeting and this website.

Additional Information:

 

2020 Updates
I-94 Jackson Corridor Virtual Public Meeting Webinar PDF icon
July 27, 2020 Project Update PDF icon
July 21, 2020 Project Update PDF icon

2019 Updates
Public Meeting FAQs - March 14, 2019 PDF icon
Feb. 25, 2019 Public Meeting Presentation PDF icon
Preliminary Layout of Lansing Ave Bridge Replacement PDF icon
Preliminary Layout of I-94/ Elm Rd Interchange Replacement PDF icon
I-94 Bridge Demolition Video
Diverging Diamond Interchange Concept Video

2018 Updates
June 11, 2018 Open House - Comments and Questions PDF icon
I-94 Public Meeting Boards PDF icon
I-94 Project Public Meeting Presentation PDF icon 
I-94 Road and Bridge Construction FAQs
Project Video

Contact Us:


Jackson Transportation Service Center, 517-780-7540
www.Michigan.gov/Drive
www.twitter.com/MDOT_LanJxn
www.facebook.com/MichiganDOT
Subscribe to the I-94 Corridor in Jackson project email list  E-mail Alert via Gov Delivery

Sours: https://www.michigan.gov/mdot/0,4616,7-151-9621_11008_86278---,00.html

Detours and Traffic Updates

Cadillac Ave bridge demolition requires closing I-94 in Detroit

What: Demolition work will close all lanes on I-94 between I-75 and Conner Ave

When: Friday, March 12, 9 pm through Monday, March 15, 5 am

Why: MDOT is replacing the Cadillac Ave overpass above I-94, originally built in 1957.

Detours

  • WB: Eight Mile to SB Gratiot Ave, WB Gratiot Connector, NB I-75, back to WB I-94. One lane of WB I-94 will be open for local traffic up to Conner Ave. All entrance ramps to WB I-94 will be closed from Chalmers to Chene St.
  • EB: SB I-75, EB Gratiot Connector, NB Gratiot Ave, EB Eight Mile, back to EB I-94. All entrance ramps to EB I-94 will be closed from I-96 to Gratiot Ave.

Ramps closed throughout construction:

  • Gratiot Ave entrance ramp to EB I-94
  • EB I-94 exit to French Rd
  • French Rd entrance ramp to WB I-94
Sours: https://i94detroit.org/news-information/detours-and-traffic-updates/

94 i mdot construction

MDOT plans another massive project for I-94

BENTON TOWNSHIP, Mich. — Drivers who have had to negotiate the huge construction project connecting the US-31 freeway with I-94 in Berrien County have another year of traffic interruptions, but the Michigan Department of Transportation is about to add another three years to that.

MDOT plans to rebuild I-94 south of the current project limits. The next rebuilding project, budgeted for $153 million, will rebuild I-94 between Exit 23 Red Arrow Highway (I-94 BL) and Britain Avenue overpass, which is the southern end of the current construction.

MDOT explains the project’s scope and specifics in this YouTube video.

The project is scheduled to include the replacement of four bridges and improvements to be made to seven other bridges.

The project begins in 2022 with maintenance work to prepare for the major reconstruction, which will take place in 2023 and 2024.

The $153 million price tag will be paid through funds from Rebuilding Michigan bonds.

MDOT is accepting public input about the project through an online comment form, by email, by by phone (), or send comments to Monica Monsma, MDOT Environmental Services Section, P.O. Box 30050, Lansing, MI 48909

Follow FOX 17: Facebook - Twitter - Instagram - YouTube

Sours: https://www.fox17online.com/news/local-news/south-mi/mdot-plans-another-massive-project-for-i-94
I-94 rebuilding project from Red Arrow Highway to Britain Avenue

That's it, time has passed and I knew that I had a maximum of 15 minutes to prepare a friend. I again noticed that Victor greedily escorted my wife, staring at her ass. Seeing that I caught his eye, he was embarrassed, but I immediately launched an attack: What, friend, is that good. Would you.

Now discussing:

Good luck. chairman. - The ward assigns himself a punishment, - the professor explained to me, - thereby the sincerity of repentance is tested. If he is too soft to himself, it is recommended to give him as much as he really deserves, plus a little.



1211 1212 1213 1214 1215